jsger.blogg.se

Sub zero standard installation
Sub zero standard installation







sub zero standard installation

Install directly within surrounding cabinetry for built-in, or add accessory panels for freestanding Scrubs the air of ethylene, mold, viruses, and bacteria every twenty minutes using NASA-based advanced air purification technology Add the filler strip width to the finished rough opening dimension.įor installation of two built-in units side by side without a filler strip, a dual installation kit will be necessary.4 (3 adjustable; 1 full-extension slide-out) If you are installing two built-in units side by side in the framed, overlay, flush inset or stainless steel application, a separating filler strip is recommended. Allow enough clearance in front of the unit for full door swing.

sub zero standard installation

Use a minimum 3" (76) filler in corner installations to assure a 90° door opening. To operate properly, the door must open a minimum of 90°. Make sure the floor under the unit is level with the surrounding finished floor. Make sure that the rough opening dimensions, door swing clearance, electrical service and plumbing are correct for the model you are about to install.

sub zero standard installation

Installation specifications are different for the flush inset application, whether you are using custom panels or Sub-Zero accessory flush inset panels. These specifications are identical for the framed, overlay and stainless steel applications. Refer to the overall dimensions and installation specifications for your specific model. Make sure that the finished rough opening where the built-in unit is being installed is properly prepared.

  • Appropriate materials to cover and protect the home and its furnishings during installation.
  • Masonite, plywood, 1/ 8" pressed fiberboard, cardboard or other suitable material to protect finished flooring.
  • Water line (4200880)- do not use self-piercing valves.
  • 4' (1.2 m) of 1/ 4" copper tubing and saddle valve for the.
  • Cordless drill and assorted drill bits.
  • Appliance dolly able to support 700 lbs (317 kg) and adequate manpower to handle the weight of the unit.
  • If the unit you receive does not match your requirements, contact your authorized Sub-Zero dealer. Before you begin the installation process, check the exact model number you need against the model number on the shipping carton. The Sub-Zero built-in line offers the following design alternatives: framed, overlay, flush inset and stainless steel models.Įach of these design options has specific installation requirements, which means it is vital that the unit match your planning and space needs. Make sure that the actual equipment that was shipped to you matches the design you are expecting to install.









    Sub zero standard installation